As of November 2026. Checked against official Osaka City, Osaka Prefecture and MGM Osaka pages on 18 November 2026.
Quick answer
Osaka's integrated resort (IR) is being built on Yumeshima, the artificial island in Osaka Bay where Expo 2025 was held. The operator is MGM Osaka, and officials are aiming for an opening around autumn 2030. It will combine hotels, a conference centre, an exhibition hall, restaurants, entertainment venues and a casino limited to 3% of the floor area. Entry to the resort itself has no fee. Only the casino has entry rules: Japanese nationals and residents pay ¥6,000 per entry and have visit limits, while foreign visitors who do not live in Japan are exempt from the fee. You must be 20 or over. Nothing is open yet, so there is nothing to visit as of November 2026.
If you live in Osaka or visit often, you will keep hearing about "the IR". This article explains it in plain English: what it is, where it is, when it is supposed to open, what is planned, how the casino rules differ for Japanese residents and foreign visitors, how to get to Yumeshima, and how the resort relates to the former Expo site next door.
This is information, not encouragement to gamble. Casino gambling carries real financial and health risks, and the casino is only one part of a much larger complex. If gambling is causing problems for you or someone you know, consult a local health or consultation service; Osaka Prefecture and the operator both say they are building support systems.
We rely on three kinds of official sources: Osaka City's dedicated Osaka IR website, Osaka Prefecture's IR pages and FAQ, and MGM Osaka's own website. Anything not confirmed by those is marked "to be confirmed". The source list is at the end.
What is the Osaka IR?
IR stands for Integrated Resort. Osaka City's Osaka IR website describes it as a facility that brings together hotels, an international conference centre, an exhibition hall, restaurants, entertainment facilities and a casino, installed and operated by MGM Osaka Co., Ltd. The company's core shareholders are Japan MGM Resorts LLC and ORIX Corporation, with 22 minority shareholders, mostly Kansai-based companies.
The city's site says the IR will be built on Yumeshima (spelled "夢洲" in Japanese), an artificial island in Osaka Bay. Under Japan's IR law, Osaka Prefecture, Osaka City and MGM Osaka are carrying out the project together. The official aim is to open around autumn 2030.
The Osaka City IR website is the main official starting point for the project (the page itself is in Japanese):
Where is it? Yumeshima
The site is on Yumeshima, in Osaka's Konohana Ward, on the same island as the 2025 Expo site. The IR area is about 49.2 hectares (492,000 m²), and the total floor area is planned at about 780,000 m². The prefecture says all of the IR land was handed over by 1 April 2026.
Open in Google Maps: Yumeshima island (the IR is planned here, beside the Expo site)
The map pin shows the island, not a finished building. The site is a construction area. MGM Osaka announced the start of IR construction work on 24 April 2025. Public access to the construction site is to be confirmed, so do not expect to be able to visit it.
When will it open?
Osaka City and Osaka Prefecture both say they are aiming for around autumn 2030 (Reiwa 12). MGM Osaka's own website says it is "starting in earnest toward opening in 2030". An exact opening date has not been announced. We found no official date. Check the city and operator websites for updates, because the opening time is the item most likely to change. MGM Osaka's news page shows that the area development plan was amended in a "minor change" filing as recently as 31 July 2026.
What will be there?
According to the Osaka City IR website (the figures are plans, not finished buildings):
Facility | Planned scale or description |
|---|---|
International conference centre | Largest meeting room for 6,000+ people; total capacity about 12,000+ |
Exhibition facility | About 20,000 m² |
Hotels | Three hotels (an entertainment hotel, a multi-generation aqua-resort hotel and a top-tier hotel for VIPs), about 2,500 rooms in total |
Yumeshima Theater | About 3,500 seats |
Promotion facilities | "Kansai Japan House", Japan Food Pavilion and Garden Theater, showcasing crafts, food and performing arts |
Tourism centre | Kansai Tourism Center, with AI and staff-assisted travel information to send visitors around Japan |
Transport | A large bus terminal and a ferry terminal |
Casino | Gaming area capped at 3% of the total IR floor area |
Visitors and investment | About 20 million visitors a year (14 million domestic, 6 million overseas); initial investment about ¥1.513 trillion (excluding tax) |
The visitor and investment numbers are estimates from the operator and the authorities. They are plans, not results.
Casino rules: Japanese residents vs foreign visitors
The casino is regulated by national law (the Act on Development of Specified Integrated Resort Districts) as well as Osaka's own measures. The key points, from Osaka Prefecture's FAQ and the official English translation of the law:
- No fee to enter the resort. The prefecture's FAQ says entering the IR costs nothing; the fee applies only to entering the casino area.
- Entry fee for Japanese nationals and others: ¥6,000. The prefecture says "Japanese nationals and others" pay ¥6,000 per entry. The law sets ¥3,000 for the national government and ¥3,000 for the prefecture, charged per 24-hour period.
- Foreign visitors who do not live in Japan are exempt. The law excludes "foreigners who do not have a residence in Japan" from the entry fee and from the entry-frequency limit. Foreigners who live in Japan are not covered by that exemption.
- Limits for those who pay: entry is restricted after 3 paid entries in 7 days or 10 in 28 days.
- Identity checks every time. Visitors are checked on every entry and exit. The law names the My Number card for Japanese nationals and many residents, and a passport for foreigners who do not live in Japan.
- Minimum age 20. People under 20 may not enter the casino facilities.
- Self- and family-requested exclusion is also part of the national rules.
- Advertising limits: the Osaka City site says advertising outside the IR area is restricted.
Because of the exact wording, details such as how foreign residents are identified depend on the rules of the Japan Casino Regulatory Commission. The translation we used may not be the latest version, and this is not legal advice. Check the Commission's website before you plan a visit.
Scams and online casinos
The Osaka Prefectural Government and MGM Osaka warn of fake sites and ads that use the "MGM Osaka" name to lead people to online casinos. MGM Osaka says it never offers, promotes or advertises online casinos. Using an online casino to gamble is a crime in Japan, and advertising one is also illegal, according to the prefecture. If you see an "Osaka IR" site that does not match the official pages listed above, do not use it.
How to get to Yumeshima
Osaka Metro Chuo Line to Yumeshima Station. The Chuo Line was extended 3.2 km from Cosmosquare Station to a new Yumeshima Station, which opened on 19 January 2025. From central Osaka the usual route is to take the Midosuji Line to Hommachi Station and change to the Chuo Line toward Cosmosquare and Yumeshima. Check the Osaka Metro timetable and route search for current times, because train frequency may differ from the Expo period.
Open in Google Maps: Yumeshima Station
Open in Google Maps: Hommachi Station
Open in Google Maps: Cosmosquare Station
The IR plans include a large bus terminal and a ferry terminal on site, which are not open yet. Osaka Prefecture says it is also improving the roads to Yumeshima. Details of the bus routes and ferry services have not been announced.
For tickets and station tips, see our Osaka Metro guide.
How the Expo site fits in
Yumeshima hosted Expo 2025 from 13 April to 13 October 2025. The Expo site is now being redeveloped as the Yumeshima Phase 2 area, separate from the IR area:
- Osaka Prefecture and Osaka City published Yumeshima Phase 2 Area Master Plan Ver. 3.0 on 19 June 2026. It sets the policy for developing the former Expo grounds.
- The prefecture's Yumeshima page says it started recruiting developers for the Phase 2 area on 3 July 2026.
- An April 2026 briefing on the draft plan says the public sector is to develop a memorial park, the Grand Roof Ring and a memorial hall. In October 2026 the prefecture announced the selection of a contractor for the ring's initial renovation design and maintenance plan. When any of these will open to visitors is to be confirmed.
- For one legacy zone (the former Osaka Healthcare Pavilion site), a January 2026 developer call received no proposals, so the prefecture is now running a market sounding survey. The site is at Yumeshima-naka 1-chome 1-50.
Open in Google Maps: Osaka Healthcare Pavilion (Nest for Reborn) site, Yumeshima
Open in Google Maps: Grand Roof Ring (Expo 2025 site, Yumeshima)
So in November 2026 the island is a mix of construction and planning rather than a finished destination.
Why Osaka's IR Matters Beyond Japan
The Osaka IR is also being watched outside Japan. South Korea already runs casino resorts for foreign visitors, and local media report concern about the 2030 opening. At the 10th Jeju International Casino Policy Forum on 9 November 2026, a former vice minister of culture, sports and tourism said Jeju needs to differentiate itself ahead of Osaka's opening. He suggested relying less on Chinese-speaking visitors and drawing more from Southeast Asia and Japan (Segye Ilbo).
On 13 November, Jeju's governor, Wi Seong-gon, was questioned about the issue in the provincial council. News1 reports that the province has not yet analysed the impact on Jeju, and that the governor said it would work with the central government on a response (News1). At a 5 November confirmation hearing, the nominee to head the Jeju Tourism Organization said he expected many casino employees to leave (Media Jeju).
These are expectations and concerns, not measured results, because the resort has not opened. For visitors and residents, nothing changes today. Osaka's own plans centre on hotels, a conference centre, an exhibition hall and entertainment, with gaming limited to 3% of floor area (Osaka City). For the latest facts on the opening, check the official sites.
What to do in Osaka before the IR opens
The resort is years away. For plans today, see our guides to where to stay in Osaka, luxury and 5-star hotels in Osaka and Osaka's theme parks and family attractions.
What is still to be confirmed
- The exact opening date (the target is only "around autumn 2030").
- Public access to the IR site and the Grand Roof Ring before opening.
- Ticketing and booking for any non-casino facilities such as the theatre.
- Bus and ferry services to and from the IR.
- The timetable and developers for the Phase 2 area.
FAQ
Is the Osaka IR open yet?
No. As of November 2026 it is under construction, and the official target is around autumn 2030.
Where is the Osaka IR?
On Yumeshima, an artificial island in Osaka Bay, in Osaka's Konohana Ward, next to the former Expo 2025 site.
Who runs it?
MGM Osaka Co., Ltd., whose core shareholders are Japan MGM Resorts LLC and ORIX Corporation, together with the prefecture and city under Japan's IR law.
Is it only a casino?
No. Plans include three hotels (about 2,500 rooms), a conference centre, an exhibition hall, a theatre, restaurants and shops. The casino area is capped at 3% of the total floor area.
Do foreign tourists have to pay to enter the casino?
Under the IR law, foreigners who do not live in Japan are excluded from the entry fee. Japanese nationals and others pay ¥6,000. Foreigners who live in Japan are not covered by the exemption. Everyone must be 20 or over and show ID.
Can I enter the IR resort without going into the casino?
Yes. The prefecture says entering the IR costs nothing; the fee applies to the casino area.
How do I get to Yumeshima?
By Osaka Metro Chuo Line to Yumeshima Station, which opened in January 2025.
Are there online "Osaka IR casinos"?
No. MGM Osaka says it never offers online casinos, and gambling at online casinos is a crime in Japan.
Sources and checking
Checked on 18 November 2026. Items marked "to be confirmed" were not found on official pages.
- Osaka City: Osaka IR (official website)
- Osaka Prefecture: Osaka IR FAQ
- Osaka Prefecture: About the Osaka IR
- Osaka Prefecture: warning about fake sites and online casinos
- MGM Osaka Co., Ltd.: website and news
- Japanese Law Translation: Act on Development of Specified Integrated Resort Districts (Articles 69, 70, 173, 176, 177)
- Osaka Metro: Chuo Line extension to Yumeshima, opening on 19 January 2025
- Osaka Prefecture: Yumeshima and Sakishima
- Osaka Prefecture: Healthcare Pavilion site market sounding
- Segye Ilbo: Jeju casinos need to differentiate ahead of the Osaka IR opening (9 Nov 2026, Korean)
- News1: Jeju governor on the Osaka casino resort (13 Nov 2026, Korean)
- Media Jeju: Jeju Tourism Organization nominee's confirmation hearing (5 Nov 2026, Korean)






